Français
Addenda
Renovations:
* 2010 - Kitchen & main bathroom was renovated . Kitchen
counters are granite & bathroom are marble.
* 2010 - Sanded & re-stained wood floor on main floor.
* 2010 - Balcony in the backyard was renovated.
* 2017 - Roof was replaced.
* 2019 - Stairs outside in the front were replaced.
* 2019 - An electric furnace was installed.
* 2023 - New garage door, Bay windows (main & second
floor), Outside front railings, Driveway & Pavi-uni.

Above ground swimming pool was added, the front Bay window
upstairs & downstairs were changed, the driveway has been
newly paved and the balcony in the backyard has been
renovated.
Share this page
About this site
Tools